Express Intervention for Gecitec // Allainville (78)
Background
The Express Intervention for Gecitec // Allainville (78) at a glance
An express intervention was carried out on a Gecitec worksite to replace a solenoid valve on an automatic Econet “STD” unit near Allainville.
The client submitted the request in the morning, and the on-site intervention was performed that same afternoon.
This allowed our client to proceed with the wind-turbine foundation pour scheduled for the following morning with complete peace of mind.
The visit also gave us the opportunity to take some great photos of the site delivered by Gecitec.
Many thanks to the on-site teams for their warm welcome!
Products
The equipment used
Find out more about the ECL-Econet solutions used on the Express Intervention for Gecitec // Allainville (78).
In pictures
The Express Intervention for Gecitec // Allainville (78) project in pictures
Contact
Ask ECL-Econet for advice
Contact us by phone, email, or by filling out the contact form on our website.
02 40 03 01 89
commercial@ecl-econet.com
ZA Les Petites Landes
44360 Cordemais
France