The Friedland Project – Razel Bec // Paris (75) at a glance

The TDL60 meets the Arc de Triomphe. Although it is not quite the same size, our 60 m³/h lamellar settling tower still stands out on the Friedland site of the EOLE project in Paris.
This new phase of the project involves deep-soil treatment through injections and jet grouting. This is where our lamellar settling tower and our T30 treatment and filtration station come into play.

The pumped water from the injection works is heavily loaded with sludge and cement grout. This water cannot be sent directly into the T30, as it would risk clogging the pump.
The TDL60 therefore performs an initial settling stage, followed by lamellar filtration in the upper section of the unit.
This lamellar filter traps sludge and grout, allowing cleaner water to be transferred to the T30 treatment station.

The decanted water then flows through the T30, passing first through our 91-micron BIG BAG filter, then through a 25-micron bag filter in this configuration.
Just before discharge into the network, CO₂ injection is applied to neutralise the pH.

Razel Bec entrusted us with the Friedland project and continues to rely on us for two additional sites scheduled to begin at the end of May and early July, using the same setup.

Civil engineering and structural worksPublic Works
Friedland Project – Razel Bec // Paris (75)
Info box

Products

The equipment used

Find out more about the ECL-Econet solutions used on the Friedland Project – Razel Bec // Paris (75).

Info box

In pictures

The Friedland Project – Razel Bec // Paris (75) project in pictures

Under the majestic presence of the Arc de Triomphe, ECL-Econet’s TDL 60 lamellar settling tower stands out on the FRIEDLAND site of the EOLE project, efficiently treating heavily loaded water generated by advanced ground-consolidation techniques.
On the FRIEDLAND site of the EOLE project in Paris, the technical performance of ECL-Econet’s TDL 60 decanter is clearly demonstrated as it plays a crucial role in treating the muddy water produced by injection works and jet grouting near the Arc de Triomphe.
Cartouche

Contact

Ask ECL-Econet for advice

Contact us by phone, email, or by filling out the contact form on our website.

Contact ECL-Econet by phone

02 40 03 01 89

Contact ECL-Econet by mail

commercial@ecl-econet.com

Visit ECL-Econet at our offices

ZA Les Petites Landes
44360 Cordemais
France

LinkedIn ECL-Econet

LinkedIn

    * Required fields / The information collected will be processed by the relevant persons within our company for the purposes of offering products and/or services and commercial prospecting. In accordance with current regulations, you have the right to object to, access, rectify, and erase your personal data.