Background
The Olympic Kayak Basin Project // Cesson-Sévigné (35) at a glance
For the expansion of the Olympic kayak basin in Cesson-Sévigné, ECL-Econet deployed a lamellar settling tower in 2022 for our client Eiffage GC, in preparation for the 2024 Olympic Games.
This solution ensured effective water management, meeting the quality and safety requirements needed to host a sporting event of this scale.
Products
The equipment used
Find out more about the ECL-Econet solutions used on the Olympic Kayak Basin Project // Cesson-Sévigné (35).
Contact
Ask ECL-Econet for advice
Contact us by phone, email, or by filling out the contact form on our website.
02 40 03 01 89
commercial@ecl-econet.com
ZA Les Petites Landes
44360 Cordemais
France
