Pont d’Ouche Viaduct Project (21)

Settling
Info box

Background

The Pont d’Ouche Viaduct Project (21) at a glance

The rehabilitation of the Pont d’Ouche Viaduct represented a major challenge for our client Bouygues Construction, requiring expert management of water generated during concrete cutting operations.

ECL-Econet provided its expertise by deploying settling and filtration solutions, using a decanter and the Econet Standard to ensure efficient pH neutralisation.

This intervention helped minimise the environmental impact of the project while meeting strict safety requirements and protecting the local ecosystem.

Civil engineering and structural worksPublic Works
Pont d’Ouche Viaduct Project (21)
Info box

Products

The equipment used

Find out more about the ECL-Econet solutions used on the Pont d’Ouche Viaduct Project (21).

Cartouche

Contact

Ask ECL-Econet for advice

Contact us by phone, email, or by filling out the contact form on our website.

Contact ECL-Econet by phone

02 40 03 01 89

Contact ECL-Econet by mail

commercial@ecl-econet.com

Visit ECL-Econet at our offices

ZA Les Petites Landes
44360 Cordemais
France

LinkedIn ECL-Econet

LinkedIn

    * Required fields / The information collected will be processed by the relevant persons within our company for the purposes of offering products and/or services and commercial prospecting. In accordance with current regulations, you have the right to object to, access, rectify, and erase your personal data.