Background
The “Puits d’Avrieux” Project — TELT (73) at a glance
The Puits d’Avrieux site, dedicated to drilling operations for the TELT project, incorporated an ECL-Econet lamellar settling tower to treat water generated during the drilling process.
This solution enabled the project team to meet the environmental and technical requirements of the site, located in Avrieux (Savoie), ensuring optimal water management throughout the operation.
Products
The equipment used
Find out more about the ECL-Econet solutions used on the “Puits d’Avrieux” Project — TELT (73).
In pictures
The “Puits d’Avrieux” Project — TELT (73) project in pictures
Contact
Ask ECL-Econet for advice
Contact us by phone, email, or by filling out the contact form on our website.
02 40 03 01 89
commercial@ecl-econet.com
ZA Les Petites Landes
44360 Cordemais
France
