Toulouse Metro – Future Line C Project // Toulouse (31)

pH filtration and neutralizationSettling
Info box

Background

The Toulouse Metro – Future Line C Project // Toulouse (31) at a glance

In 2023, ECL-Econet was selected by the Eiffage Génie Civil / NGE-BTP consortium to handle groundwater and dewatering water treatment for 12 stations across lots 1 and 2 of the future Toulouse Metro Line C.

On a project of this scale, environmental requirements — particularly water management — are significant. We are proud to contribute our expertise and treatment systems to support the consortium in meeting these obligations.


Equipment deployed:

  • 4 m³ recovery and pumping tank
  • Primary settling unit
  • Eco-Floc module
  • Lamellar Settling Tower
  • Econet T20 treatment unit
Building ConstructionCivil engineering and structural worksPublic Works
Toulouse Metro – Future Line C Project // Toulouse (31)
Info box

Products

The equipment used

Find out more about the ECL-Econet solutions used on the Toulouse Metro – Future Line C Project // Toulouse (31).

Info box

In pictures

The Toulouse Metro – Future Line C Project // Toulouse (31) project in pictures

Cartouche

Contact

Ask ECL-Econet for advice

Contact us by phone, email, or by filling out the contact form on our website.

Contact ECL-Econet by phone

02 40 03 01 89

Contact ECL-Econet by mail

commercial@ecl-econet.com

Visit ECL-Econet at our offices

ZA Les Petites Landes
44360 Cordemais
France

LinkedIn ECL-Econet

LinkedIn

    * Required fields / The information collected will be processed by the relevant persons within our company for the purposes of offering products and/or services and commercial prospecting. In accordance with current regulations, you have the right to object to, access, rectify, and erase your personal data.