Lamellar Settling Tower

Reference: TDL
The TDL (Lamellar Settling Tower) improves settling performance by reducing the footprint on the ground, increasing the settling surface area, and integrating an automated primary sludge evacuation system.
Compact
Easy maintenance
Simple and quick to implement
Lamellar Settling Tower
Cartouche

Your Needs

How to Use the Lamellar Settling Tower?

Use the Lamellar Settling Tower to treat drilling water, groundwater lowering flows, and process water.
Cartouche

Technical specifications

The Lamellar Settling Tower in details

The Lamellar Settling Tower presented here is designed to maximise efficiency in separating suspended solids.
Equipped with honeycomb lamellar filters, it enables one- or two-stage settling for improved water clarification.
Gravity settling facilitates the accumulation of suspended solids (TSS) at the bottom of the cone, helping optimise treated-water quality.
The tower includes an inlet flow breaker and can be connected from DN200 down to 2 inches, making it adaptable to different system configurations.
Settled sludge is discharged through an automated pump.
An access ladder with safety cage and an elevated working platform ensure safe and convenient maintenance.
Clarified water exits at the top of the tower, marking the end of the settling process.

Lamellar Settling Tower
Lamellar cellular filters
U
Decanted water outlet
U
Loaded water inlet
U
Discharge of settled sediments
U
Ladder with safety cage and elevated working platform
U
Automated pump for discharging settled sediments
U
Inlet flow breaker. Connection possible from DN200 down to 2 inches
U
Gravity settling for recovering initial suspended solids at the bottom of the cone
U
Honeycomb lamellar filters arranged in one or two stages. Filters are stored in a dedicated basket
U
Cartouche

Lamellar Settling Tower ranges

Find the model that suits your project

Range Dimensions (L×W×H) Empty weight Treatment flow rate Filtration capacity Power supply Product sheet User manual
TDL 20 2,43 x 1,54 x 3,93 m 950 Kg 20 m³/h 5 m³ Three-phase PDF PDF
TDL 50 2,44 x 1,94 x 3,93 m 1,900 Kg 50 m³/h 8 m³ Three-phase PDF PDF
TDL 120 2,97 x 2,44 x 5,86 m 3,200 Kg 120 m³/h 18 m³ Three-phase PDF PDF
Cartouche

In pictures

The Lamellar Settling Tower in pictures

Cartouche

Options

Options for the Lamellar Settling Tower

Régulateur de CO2

CO₂ regulator

Montage sur roue

Wheel-mounted version

Canne de remplissage

Filling lance

Tuyau de refoulement

Discharge hose

Lance stop net

Stop-net lance

Couleur personnalisée

Custom colour

Cartouche

Equipment and services

Complementary services for ECL-Econet products

Filters

ECL-Econet offers a wide range of filtration solutions, from 91-micron Big Bags designed for easy handling to precision filter bags down to 1 micron.

Discover our filters

Gas management and supply

We provide on-site supply of gas cylinders under a rental contract.

Request a quote

Transport

We organise equipment transport to your site (flatbed or covered truck).

Request a quote

Commissioning

We can install and connect your ECONET unit and train your staff in its operation on site.

Request a quote

ECL-Econet by your side on your worksite

Every project requires a tailored approach. This is why ECL-Econet has developed a complete range of ECONET washing and water-treatment stations to support your worksite needs wherever you are. Contact us for guidance or a free quote.

Cartouche

Projects

Our worksites and achievements

Tous
Settling
pH filtration and neutralization
Supports and structures
Custom-made
Cruard Charpente Prefabrication Plant

Cruard Charpente Prefabrication Plant // Simplé (53)

Toulouse Metro – Future Line C Project // Toulouse (31)<br>

Toulouse Metro – Future Line C Project // Toulouse (31)

Eiffage GC Infra Linéaires // Roche-en-Forez (42)

Eiffage GC Infra Linéaires // Roche-en-Forez (42)

Aevia – Fabrèges Dam Project // Laruns (64)

Aevia – Fabrèges Dam Project // Laruns (64)

Toulouse Metro – Future Line C Project // Toulouse (31)<br>

Toulouse Metro – Future Line C Project // Toulouse (31)

Construction-site water treatment and settling

Charles de Gaulle Project – Toulon (83) // SONOCAR

Construction-site water treatment and settling

Friedland Project – Razel Bec // Paris (75)

Construction-site water treatment and settling

Olympic Kayak Basin Project // Cesson-Sévigné (35)

Cruard Charpente Prefabrication Plant

Cruard Charpente Prefabrication Plant // Simplé (53)

Toulouse Metro – Future Line C Project // Toulouse (31)<br>

Toulouse Metro – Future Line C Project // Toulouse (31)

Eiffage GC Infra Linéaires // Roche-en-Forez (42)

Eiffage GC Infra Linéaires // Roche-en-Forez (42)

Aevia – Fabrèges Dam Project // Laruns (64)

Aevia – Fabrèges Dam Project // Laruns (64)

Acti Hall Sofialex // Mionnay 01

Acti Hall Sofialex // Mionnay 01

Construction-site water treatment and settling

Charles de Gaulle Project – Toulon (83) // SONOCAR

Construction-site water treatment and settling

“Brazza” Project – Eiffage Construction Aquitaine // Bordeaux (33)

Construction-site water treatment and settling

Fayat Group Project // Nice (06)

Cartouche

References

They trust us

Références ECL-Econet
Cartouche

Contact

Get advice on ECL-Econet services

Contactez ECL-Econet par téléphone

+33 2 40 03 01 89

Contactez ECL-Econet par mail

commercial@ecl-econet.com

Rencontrez ECL-Econet dans nos locaux

ZA Les Petites Landes
44360 Cordemais
France

LinkedIn ECL-Econet

LinkedIn

    * Required fields / The information collected will be processed by the relevant persons within our company for the purposes of offering products and/or services and commercial prospecting. In accordance with current regulations, you have the right to object to, access, rectify, and erase your personal data.